The contract involves lowering the track geometry at eight overpasses and the repair of a steel track bridge. The main phases of the contract are superstructure work, substructure work, excavation work, rock piling and networking work, renewal of the railway bridge girder beams and surface treatment of the bridge frame and railing installation work, as well as luminaire installation work and related high-current work, as well as protection and relocation of sub-track and other cables.
Project information
Contact person
Jari Hinttala +358 50 449 7975
Client
Finnish Transport Infrastructure Agency
Project period